LA1 Pile Test Program
August 25, 2004

As of August 21, 2004 our LA! Pile Load Test Program has come to a successful conclusion.

Photo 1: Inspector monitoring data during one of the pile test loading sequences.

Photo 2: Boh Bros., pile test contractor, rigging the hydraulic
jack to test concrete pile to 600 tons.

Photo 3: Rigging test pile with instrumentation prior to driving.